NEWS
A diagram of the construction and installation of the pipeline system in the natural gas household
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2017-07-11
- Views:0
(Summary description)The pipe must close the gas source valve before installation, if the hose after unpacking is broken, it shall not be used, and at the same time install the front strictly prevent the hose from bending several times, resulting in the cumulative number of bends exceeding the standard number of times, resulting in the hose damage, the hose installed in the wall is not allowed to cut the connection, must keep the pipe body intact to prevent leakage
A diagram of the construction and installation of the pipeline system in the natural gas household
(Summary description)The pipe must close the gas source valve before installation, if the hose after unpacking is broken, it shall not be used, and at the same time install the front strictly prevent the hose from bending several times, resulting in the cumulative number of bends exceeding the standard number of times, resulting in the hose damage, the hose installed in the wall is not allowed to cut the connection, must keep the pipe body intact to prevent leakage
- Categories:Industry News
- Author:
- Origin:
- Time of issue:2017-07-11
- Views:0
Scan the QR code to read on your phone
Contact Us
ADD:No. 369 shunyu West Road, Yangming Street, Yuyao City, Zhejiang, China
TEL:0086-574-62520178
M.T.:18858067754
FAX:0086-574-62528098
Website: www.chinayuanbang.com, www.zjyuanbang.com
E-mail:[email protected]

Copyright © 2020 Zhejiang Guli Pipe Industry Co., Ltd.,Ltd. All rights reserved. 浙ICP备11053595号-1 Powered by www.300.cn